3 Bedroom Apartments (Marina Douro 3) Vila Nova De Gaia, São Pedro Da Afurada
3 Beds
3 Baths
Updated: June 29
1
Views for last 30 days
About the Property
The development consists of 4 5-storey buildings + Recuado. With a total of 157 apartments, the typologies range from T1 to T5, with fully equipped kitchens and large balconies with panoramic views. Some apartments have a terrace with private pool or jacuzzi. The Marina Douro Project incorporates all the essential aspects of a comfortable family life. Residents will have access to the garden and p
The development consists of 4 5-storey buildings + Recuado. With a total of 157 apartments, the typologies range from T1 to T5, with fully equipped kitchens and large balconies with panoramic views. Some apartments have a terrace with private pool or jacuzzi. The Marina Douro Project incorporates all the essential aspects of a comfortable family life. Residents will have access to the garden and playground common to the buildings, contributing to a greater spirit of community and conviviality among families. All apartments have private parking spaces in the garage of your building. Fifteen T3 available: _T3, orientation east/north: 730000 euros _T3, orientation west/north: 800000 euros _T3, orientation east/north: 665000 euros _T3, orientation west/east: 685000 euros _T3, orientation south/west: 765000 euros _T3, orientation east/north: 695000 euros _T3, orientation west/east: 730000 euros _T3, south/west orientation: 815000 euros _T3, east/north orientation: 735000 euros _T3, west/east orientation: 755000 euros _T3, south/west orientation: 875000 euros _T3, east/north orientation: 795000 euros _T3, west/east orientation: 815000 euros _T3, south/east orientation: 865000 euros _T3, south/west orientation: 915000 euros (advertised property) These properties are in the fraction M3 and have a parking space and storage included in the price. Possibility of purchasing other storage rooms (there being still parking and parking with storage) Terms and Conditions: The deadline for M1, M2, M3 and M4 is 33 months for the construction. Conditions: 20% Sign; 10% Ref Sign with the completion of the reinforced concrete structure; 10% Ref Sign with the framing; Remaining in the deed. (ref OP-012007027)