$630,660

New 3-Bedroom Semi-Detached House in Pinhal General – Construction Scheduled to Begin in Early 2027

  • 3 Beds
  • 4 Baths
  • 1,669 Sqft
  • 2,239 Sqft lot
  • Updated: July 28

About the Property

We are pleased to present this fantastic new 3-bedroom semi-detached house with contemporary architecture, scheduled to begin construction in early 2027. Designed to provide comfort, functionality and an excellent quality of life, this property offers a perfect balance of modern design and practical living.

Set on a 208.33 m² plot, the house is arranged over a basement, ground floor and f
We are pleased to present this fantastic new 3-bedroom semi-detached house with contemporary architecture, scheduled to begin construction in early 2027. Designed to provide comfort, functionality and an excellent quality of life, this property offers a perfect balance of modern design and practical living.

Set on a 208.33 m² plot, the house is arranged over a basement, ground floor and first floor, and also includes a detached annex, providing an excellent combination of indoor and outdoor living spaces.

The property has a footprint of 63.87 m² and a total gross construction area of 155.35 m², distributed across two residential floors. The ground floor features a spacious open-plan living and dining area with a modern kitchen, offering a total area of 52.75 m². This bright and welcoming space has been designed for everyday family living and entertaining guests. A guest bathroom measuring 2.40 m² is also located on this floor.

The first floor comprises the private sleeping area, featuring three bedrooms. Two bedrooms measure 11.10 m² and 11.70 m² respectively and are served by a fully equipped family bathroom of 3.65 m². The master suite offers 14.00 m² of living space and benefits from a private en-suite bathroom of 4.70 m², ensuring greater comfort and privacy.

The basement, with an area of 32.80 m², provides a versatile space that can be used as a garage, storage area, home office, gym or leisure room. It also includes an additional bathroom of 2.70 m².

This home has been carefully designed to meet the demands of modern living, featuring generous living areas, an excellent internal layout and contemporary architecture. With construction scheduled to begin in early 2027, this is an outstanding opportunity to purchase a brand-new home. Depending on the stage of construction, buyers may also have the opportunity to personalise selected finishes and materials, creating a home tailored to their own style and preferences.

If you are looking for a new home with spacious interiors, an excellent layout and a project designed to deliver comfort, quality and well-being, this could be the ideal opportunity for you. Contact us today for further information, floor plans, the specifications and finishes brochure, and full purchasing details.

…
  • Property type

    Villa

  • Year built

    2027

  • Price/sqft

    $378

Features

  • Garden
  • Pool
  • Open Kitchen
  • Modern
  • 2D Floor Plan
  • New Builds
  • Basement
  • Air Conditioning
  • Balcony

Explore the Area

Rua Antero de Figueiredo, Fernão Ferro, Fernao Ferro, Setubal District, Portugal View on Google Maps
Price per sqft
Low
High

View 337 more listings in Fernao Ferro

CENTURY 21 Rio

Joined 5 years ago
Your message
You have inquired about this property

The agent will contact you soon by

Listed by

CENTURY 21 Rio
Portugal
View agency profile
34
Listings
2022
Joined

Book home tour with the agent

Choose a date and whether you'd like a virtual or in-person tour with the agent.

In-person tour
Preferred date
Tour type
CENTURY 21 Rio
Almada, Portugal
View agency profile
Last updated
July 28
First listed
July 28
Listing reference
C0442-00733
Call

Start phone call with:

Hello, I’m calling for the property with the reference C0442-00733, which I discovered on JamesEdition.

After the call, we'll provide your contacts to the agent for easy communication.