$641,628

3-Bedroom Semi-Detached House with Swimming Pool and Basement | Construction Scheduled to Begin in 2

  • 3 Beds
  • 4 Baths
  • 1,378 Sqft
  • 1,712 Sqft lot
  • Updated: July 25

About the Property

Discover this modern 3-bedroom semi-detached house, a contemporary architectural project that combines comfort, functionality and high-quality construction. With building works scheduled to begin in early 2027, this represents an excellent opportunity to acquire a brand-new home, with the possibility of following the progress of the construction and, depending on the stage of the works, personalis
Discover this modern 3-bedroom semi-detached house, a contemporary architectural project that combines comfort, functionality and high-quality construction. With building works scheduled to begin in early 2027, this represents an excellent opportunity to acquire a brand-new home, with the possibility of following the progress of the construction and, depending on the stage of the works, personalising certain finishes.

Set on a 159.22 m² plot, the property is distributed over a basement, ground floor and first floor. It also benefits from a separate 27.30 m² garage and a private swimming pool, ideal for enjoying summer days with complete comfort and privacy.

With a total gross construction area of 127.96 m² and a footprint of 63.87 m², the house has been designed to maximise natural light and ensure a practical and functional layout.

The ground floor is entirely dedicated to the social area of the home, where a spacious living and dining room connects harmoniously with the open-plan kitchen, providing a total area of 52.75 m². This space has been designed to offer a welcoming and practical environment, perfect for everyday family life and entertaining guests. This floor also includes a guest bathroom measuring 2.40 m².

The first floor comprises the private area of the house, consisting of three bedrooms. Two of the bedrooms, measuring 11.10 m² and 11.70 m², are supported by a full bathroom of 3.65 m². The master suite, with an area of 14.00 m², offers a private and comfortable space, complemented by an en-suite bathroom measuring 4.70 m².

The basement, with an area of 41.80 m², provides an additional versatile space that can be adapted to suit different needs, such as an additional garage area, home cinema, gym, office, games room or storage space. It also includes a supporting bathroom measuring 2.70 m².

Outside, in addition to the separate 27.30 m² garage, the private swimming pool stands out as a valuable feature, enhancing the property and creating the perfect setting for leisure moments with family and friends.

This property stands out for its modern architecture, excellent space organisation and the perfect balance between design, comfort and functionality, making it an ideal choice for those looking for a contemporary home at an early stage of construction.

Do not miss this opportunity to invest in a new-build property designed to meet the demands of modern living and provide an exceptional quality of life. Contact us for further information, floor plans, the specifications and finishes brochure, and all purchasing details.
…
  • Property type

    Villa

  • Year built

    2027

  • Price/sqft

    $465

Features

  • Garden
  • Pool
  • Garage
  • Open Kitchen
  • Modern
  • 2D Floor Plan
  • New Builds
  • Basement
  • Air Conditioning
Features

Lot

  • New Builds
  • Modern

Indoor

  • Air Conditioning
  • Open Kitchen
  • Basement

Outdoor

  • Balcony
  • Pool
  • Garage
  • Garden

Explore the Area

Rua Antero de Figueiredo, Fernão Ferro, Fernao Ferro, Setubal District, Portugal View on Google Maps
Price per sqft
Low
High

View 337 more listings in Fernao Ferro

CENTURY 21 Rio

Joined 5 years ago
Your message
You have inquired about this property

The agent will contact you soon by

Listed by

CENTURY 21 Rio
Portugal
View agency profile
34
Listings
2022
Joined

Book home tour with the agent

Choose a date and whether you'd like a virtual or in-person tour with the agent.

In-person tour
Preferred date
Tour type
CENTURY 21 Rio
Almada, Portugal
View agency profile
Last updated
July 25
First listed
July 25
Listing reference
C0442-00731
Call

Start phone call with:

Hello, I’m calling for the property with the reference C0442-00731, which I discovered on JamesEdition.

After the call, we'll provide your contacts to the agent for easy communication.