New 3-Bedroom Villa with Swimming Pool in Marinhais (Salvaterra de Magos)
A newly built, single-story 3-bedroom villa with a construction area of 138.60 m², situated on a 310 m² plot in the ”Urbanização das Acácias” development in Marinhais. Located in a quiet, safe area with easy access to all amenities.
The House
Open-plan living room and kitchen (34 m²) featuring an
New 3-Bedroom Villa with Swimming Pool in Marinhais (Salvaterra de Magos)
A newly built, single-story 3-bedroom villa with a construction area of 138.60 m², situated on a 310 m² plot in the ”Urbanização das Acácias” development in Marinhais. Located in a quiet, safe area with easy access to all amenities.
The House
Open-plan living room and kitchen (34 m²) featuring an LED-lit island, quartz countertops, and included appliances. Master suite (14 m²) with a walk-in closet and private en-suite bathroom. Two bedrooms (12 m² each) and a shared guest bathroom. Built-in oak wardrobes equipped with Blum opening systems. Garage with a motorized sectional door. Saltwater swimming pool measuring 6 x 3.5 m.
Construction and Efficiency
Double-walled construction with 8 cm ”Roofmate” thermal insulation. Cortizo PVC window frames with double glazing (solar control and low-emissivity). Electric thermal shutters. Four solar panels installed on the roof. Pre-installation for air conditioning. Efapel electrical fixtures and recessed exterior lighting.
Exterior
Boundary walls with two gates (one motorized). Paved border surrounding the house. Garage entrance finished in smooth-troweled concrete.
Customization As the villa is yet to be built, you have the opportunity to select the finishes, including flooring, wall tiles, color schemes, kitchen design, and sanitary ware. There is also an option to reconfigure the layout into a 4-bedroom home featuring two suites. Location
750 m from Continente 800 m from the Marinhais C+S School 150 m from the EN118 road Parking available right at the entrance; the plot is equipped with water, electricity, sewage, and internet connections.
Expected completion: late 2027.
The technical specifications document (caderno de encargos) is available upon request.
Schedule your visit to the plot today and discover the project in detail.
NOTES:
1- Property currently in the construction/planning phase.
2- All information, images, floor plans, finishes, and prices presented are for informational purposes only and are non-binding; they are subject to change or variation due to technical, licensing, or commercial requirements.
3- The urban development process is currently underway; the finalization of the transaction is contingent upon its approval.
4- The 3D images are for illustrative purposes only. #ref: 165110