Living room with open kitchen 23m2 Fully equipped kitchen Master suite 25m2 (Bedroom: 14m2 + Bathroom: 5m2 + Walk-in closet: 5m2) Bathroom 3m2 Hallway 4m2 Garden 32m2
Parking space Herringbone-patterned natural oak flooring Minimalist aluminum window frames with thermal and acoustic insulation Air conditioning built into the
54m2 2nd floor with elevator
Living room with open kitchen 23m2 Fully equipped kitchen Master suite 25m2 (Bedroom: 14m2 + Bathroom: 5m2 + Walk-in closet: 5m2) Bathroom 3m2 Hallway 4m2 Garden 32m2
Parking space Herringbone-patterned natural oak flooring Minimalist aluminum window frames with thermal and acoustic insulation Air conditioning built into the drop ceiling Kitchen equipped with Siemens appliances Kitchen and bathroom with Hansgrohe faucets Carrara marble in the kitchen and bathroom Sun exposure: East Energy rating: A
One-bedroom apartment located on the 2nd floor, with a seamless flow between indoor and outdoor spaces, facing east. Very bright, it features a guest bathroom at the entrance, followed by the open-concept living room and kitchen, which open onto the garden. The master suite is preceded by a walk-in closet and a bathroom. The materials used are high-quality, with hardwood floors and marble bathrooms. This apartment is part of a development located just a few meters from Av. da Boavista and Casa da Música, designed by architect Ana Coelho, which stands out for the quality of its construction and materials, as well as the importance given to the common and private areas of each apartment. It is a minimalist project with delicate details, where the quality of the materials, along with their durability, contribute to its timelessness, as they ensure the building’s longevity. This development consists of 15 one-bedroom apartments, featuring Class A energy efficiency and efficient climate control and comfort systems. In addition, all units incorporate natural elements through the use of plants, creating a serene atmosphere right in the heart of the city. Prime location, close to top-rated schools, hospitals, cultural centers, shopping districts, and an extensive public transportation network with connections to the airport. Expected completion date: fourth quarter of 2027.