Exclusive 3 Bedroom Duplex With 92 M² Of Terraces And Excellent Sun Exposure – Marvila, Lisbon
3 Beds
3 Baths
2,659 Sqft
Updated: December 19, 2025
About the Property
An exclusive 3-bedroom duplex on the 4th floor, offering 155 m² of private gross area and 92 m² of terraces, all enjoying excellent sun exposure. The south-facing terraces, totaling 40 m² — 20 m² on the 4th floor adjacent to the living room and 20 m² on the 5th floor serving the office and one of the bedrooms — create the perfect setting to enjoy Lisbon’s natural light throughout the day.
An exclusive 3-bedroom duplex on the 4th floor, offering 155 m² of private gross area and 92 m² of terraces, all enjoying excellent sun exposure. The south-facing terraces, totaling 40 m² — 20 m² on the 4th floor adjacent to the living room and 20 m² on the 5th floor serving the office and one of the bedrooms — create the perfect setting to enjoy Lisbon’s natural light throughout the day.
The spacious 38.3 m² living room offers a versatile and inviting atmosphere, ideal for entertaining, family gatherings, or simply relaxing in an elegant and comfortable environment. The 12.5 m² kitchen was designed for those who truly love cooking, combining functionality with modern style.
Part of Formoso | Marvila, Lisbon — a new residential development signed by renowned architect Bak Gordon — this apartment combines contemporary design, comfort, and quality of life, representing a unique opportunity in one of Lisbon’s most vibrant districts.
This private gated condominium comprises 49 apartments (from 1- to 4-bedroom, including 4 duplexes), each with a distinctive character and designed to offer an exclusive living experience with a contemporary and artistic atmosphere.
Exclusive amenities include a landscaped garden with art installations, heated rooftop pool, clubhouse, gym, sauna, and concierge service. All apartments include private parking with EV charging. Prime location just 10 minutes from Lisbon Airport, with excellent road access and public transport connections. Completion scheduled for 2028.