Akoya — Jesolo Lido Where Architecture Meets The Sea
Updated: Today
About the Property
In a valuable corner of Jesolo Lido, AKOYA is born: an exclusive residential boutique of only 23 units, designed for those who wish to live comfort, beauty, and privacy 365 days a year.
The location Central and well-served position, a few steps from Piazza Milano. Via Altinate is an iconic street of the destination, dotted with hotels, residences, and services, with multiple direct ac
In a valuable corner of Jesolo Lido, AKOYA is born: an exclusive residential boutique of only 23 units, designed for those who wish to live comfort, beauty, and privacy 365 days a year.
The location Central and well-served position, a few steps from Piazza Milano. Via Altinate is an iconic street of the destination, dotted with hotels, residences, and services, with multiple direct accesses to the beach: the sea becomes a daily gesture, simple and immediate.
The building Six floors above ground, 23 apartments, and a commercial unit on the ground floor (about 114 sqm) with an external relevant space overlooking Via Anasso and Via Altinate. Each typical floor hosts four independent apartments; the ground floor includes three residential units with private garden.
The apartments Few large-sized units, cared for in every detail: generous living rooms, two or three bedrooms, two bathrooms, internal height approx. 2.70 m. All accommodations have usable outdoor spaces — private gardens on the ground floor, large terraces on the upper floors — transforming the outlook into a continuous experience between inside and outside. Parking space in an underground garage included for each unit (double in length for larger types).
The common spaces Infinity pool and solarium with wood-design gres paving Private green areas and common spaces enhanced with the finest details Automated pedestrian and driveway access, video intercom
Efficiency and comfort Energy Class A4. Anti-seismic reinforced concrete structure, high-performance external thermal insulation, dedicated air/water heat pump for each unit with underfloor heating and ceiling ducted cooling, private photovoltaic system on the roof.
Timelines Work start autumn 2026 — expected delivery spring 2028.