4.5 Room Holiday Apartment No. 9 In The Village Center, 3rd Floor New Building Chalet Ibex
2 Beds
2 Baths
1,464 Sqft
6,427 Sqft lot
Updated: July 29
23
Views for last 30 days
About the Property
The 4.5-room apartment is located on the 3rd floor of the new multi-family building Chalet Ibex, which comprises a total of 15 residential units at Dorfstrasse 78 in Grindelwald. As a new building, the project offers the opportunity to design the interior according to personal ideas and needs. Highlights of the apartment: Open living kitchen: Modern design with a seamless transition to the
The 4.5-room apartment is located on the 3rd floor of the new multi-family building Chalet Ibex, which comprises a total of 15 residential units at Dorfstrasse 78 in Grindelwald. As a new building, the project offers the opportunity to design the interior according to personal ideas and needs. Highlights of the apartment: Open living kitchen: Modern design with a seamless transition to the living and dining area. Bright living space: Floor-to-ceiling windows for maximum brightness and a generous feeling of space. Large balcony: Perfect for relaxing and enjoying. Unobstructed view: Free view of the mountain world – a panorama that will be preserved permanently. Own laundry tower: Practical comfort directly in the apartment. A placement in the basement is also possible upon request. Elevator in the building: Barrier-free access to all levels. Roof-integrated photovoltaic system: Sustainable power generation for the entire house. Connection to the district heating Grindelwald: Efficient, environmentally friendly, and comfortable heating supply. Additional benefits: E-Mobility: Basic installation for electric charging stations is planned at the parking spaces. Modern construction standard: Individual construction wishes are included in the purchase price. Professional advice: The teams from GRIWA INTERIOR and GRIWA ARCHITEKTUR assist with material and equipment selection. Holiday apartment suitability: The apartment can be used both as a second home and rented out commercially on a short-term basis. Project status: under construction / construction start: started / completion: 2029