Fração B M2. A1 B T3 Lote 2 Bloco A Floor 1 (Rc) T3. Fr. Eq Orientação W/N Area 127,3 Exterior 182,7
3 Beds
3 Baths
Updated: June 18
1
Views for last 30 days
About the Property
FRACTION B M2. A1B_T3 LOT 2 BLOCK A FLOOR 1 (RC) T3. Equivalent fraction ORIENTATION - W/N AREA 127.3 EXTERIOR 182.7 TOTAL 310.0
PARKING: - 2 SPACES P. 76_P. 77 - AREA 25.8 - FLOOR -2
STORAGE: - A. 55 - AREA 3.4 - FLOOR -2
PAYMENT CONDITIONS: The deadline for M1, M2, M3, and M4 is 33 months for construction. Conditions: - 2
FRACTION B M2. A1B_T3 LOT 2 BLOCK A FLOOR 1 (RC) T3. Equivalent fraction ORIENTATION - W/N AREA 127.3 EXTERIOR 182.7 TOTAL 310.0
PARKING: - 2 SPACES P. 76_P. 77 - AREA 25.8 - FLOOR -2
STORAGE: - A. 55 - AREA 3.4 - FLOOR -2
PAYMENT CONDITIONS: The deadline for M1, M2, M3, and M4 is 33 months for construction. Conditions: - 20% on signing; - 10% on signing with completion of the reinforced concrete structure; - 10% on signing with framing; - Remaining balance on the deed. (ref OP-013007100)