'Serenity Villas', Boavista Serra Do Bouro. Plot 3
4 Beds
4 Baths
2,799 Sqft
8,332 Sqft lot
Updated: June 18
8
Views for last 30 days
1
About the Property
Lot 3 774.27 m2 €640,000
Serenity Villas Live in the countryside, by the sea, in a villa with contemporary architecture, built with the most modern and efficient construction techniques. A set of 4 independent houses, two T3 and two T4, overlooking the countryside, with terrace and swimming pool. This allotment is located in the West zone, in Boavista, Serra do Bouro (Caldas d
Lot 3 774.27 m2 €640,000
Serenity Villas Live in the countryside, by the sea, in a villa with contemporary architecture, built with the most modern and efficient construction techniques. A set of 4 independent houses, two T3 and two T4, overlooking the countryside, with terrace and swimming pool. This allotment is located in the West zone, in Boavista, Serra do Bouro (Caldas da Rainha). About 7 km from the beach of São Martinho do Porto and 5 km from Foz do Arelho, 10 minutes from Caldas da Rainha, 20 minutes from Nazaré, Alcobaça or Óbidos and approximately 45 minutes from Lisbon Airport.
They are distinguished by the high level of construction quality, with innovative techniques and materials, namely with regard to interior and exterior insulation, motto of Arte Vital Construções.
Equipment and technical characteristics: Solar panels and solar water heater for water heating Air conditioning, electric blinds, high performance sound and thermal frames with oscilobatente. Superior efficiency VMC system. Fully equipped kitchen with Bosch or Whirlpool appliances.
Lot 3 The villa is located on a plot of 774.27 m2, with a construction area of 260 m2. It has a swimming pool with 28 m2, porches with 22 m2, balconies with 99.20 and parking for 1 car.
FLOOR 0 (171.25 m2) Hall with 7 m2, 1 Suite with 15.10 m2 with walk in closet 1 Bedroom with 13.3 m2 1 WC Living/dining room and kitchen, in ’open space’ with about 60 m2 and pantry Service WC with 3.70 m2 and pantry/laundry with 5.50 m2, Interior gardens.
Expected completion date of the works: September 2023