Exclusive 3.2-hectare farm in the heart of the Costa Vicentina Natural Park, next to the surfing paradise of Carrapateira. This rare property stands out for its abundance of water and strategic proximity to the famous Praia do Amado.
Property Description
Flat land: 32,250 m² of fertile soil, fully usable and bordered by a stream. Constructed area: Single building of 150 m², i
Exclusive 3.2-hectare farm in the heart of the Costa Vicentina Natural Park, next to the surfing paradise of Carrapateira. This rare property stands out for its abundance of water and strategic proximity to the famous Praia do Amado.
Property Description
Flat land: 32,250 m² of fertile soil, fully usable and bordered by a stream. Constructed area: Single building of 150 m², intelligently divided into 3 independent 2 bedroom villas. Water resources: Own water well and direct confrontation with a natural stream. Infrastructure: Fully connected to the public water and electricity network. Setting: Inserted in a protected area, ensuring absolute privacy and contact with nature
Strategic Location and Lifestyle
Mecca do Surf: A few minutes from Praia do Amado, internationally referenced for its consistent surfing. Protected Isolation: Inserted in a natural park where new constructions are severely limited, guaranteeing exclusivity. Nature Tourism: Privileged route for ecological tourism, Rota Vicentina trails and well-being.
Self-Sufficiency and Natural Wealth
Water in Abundance: The combination of well, stream and water from the public network ensures total water security. Agricultural/Permaculture Potential: Flat and fertile land, ideal for organic farming projects or riding arena. Microclimate: The proximity of the stream creates a fresh and visually stunning surrounding green area.
Business and Investment Versatility
Immediate Profitability: The 3 independent villas allow you to create a concept of surf camp, rural tourism or co-living. Mixed Model: Possibility of residing in one of the houses and placing the other two on the local accommodation market. Ready to Develop: It dispenses with the long and complex water and electricity licensing processes because it already has public connections. Energy Rating: F #ref:Qt-1053