Attraktives Reihenhaus In Establiments. Die Bauarbeiten Sollen Bis Ende 2025 Abgeschlossen Sein.
3 Schlafz.
4 Bäder
3,660 Sqft
5,779 Sqft lot
Aktualisiert: August 13
3
Ansichten der letzten 30 Tage
1
Über die Immobilie
Beschreibung wurde automatisch übersetzt.
Die Beschreibung wird in der Originalsprache angezeigt.
The property is located on a 536.80 m² plot and is a two-storey house with a total floor area of 340 m² and 280 m² of usable space. Ground floor with entrance hall, interior patio, living/dining room with fireplace and fully equipped and furnished open-plan kitchen, laundry room, 1 toilet and 1 bedroom with 1 en-suite bathroom with dressing room. Garage for 2 cars. This floor has access to
The property is located on a 536.80 m² plot and is a two-storey house with a total floor area of 340 m² and 280 m² of usable space. Ground floor with entrance hall, interior patio, living/dining room with fireplace and fully equipped and furnished open-plan kitchen, laundry room, 1 toilet and 1 bedroom with 1 en-suite bathroom with dressing room. Garage for 2 cars. This floor has access to the garden with pergola and saltwater swimming pool. First floor with 2 bedrooms and 2 bathrooms and large terrace of 102m2. Underfloor heating in natural stone and oak, air conditioning, satellite TV, video intercom, drip irrigation and barbecue, oak carpentry and alarm. Establiments is a highly sought-after and quiet area, with all kinds of services and just a few minutes from the centre of Palma and 20 minutes from the airport.
Located in Establiments, a peaceful suburb of Palma de Mallorca, this property offers convenient access to Palma city center and the Mediterranean coast within a 15-minute drive. Nearby amenities include upscale dining, golf clubs, and natural parks. Palma Airport is reachable in 20 minutes, providing easy international connectivity. The area balances residential tranquility with proximity to cultural venues, shopping, and quality international schools.