We offer a modern new building under construction, located in a quiet and pleasant part of the island of Vir. The property is located in an excellent location, only 300 meters from the beach and 1300 meters from the town center.
The planned completion of all works is scheduled for the middle of 2027.
Basic information about the facility
The building consists of a total o
We offer a modern new building under construction, located in a quiet and pleasant part of the island of Vir. The property is located in an excellent location, only 300 meters from the beach and 1300 meters from the town center.
The planned completion of all works is scheduled for the middle of 2027.
Basic information about the facility
The building consists of a total of 4 residential units with an identical area of 47.84 m².
Each apartment consists of the following rooms: Hallway Kitchen and living room (open concept) Bathroom Two bedrooms Balcony of 6.5 m²
Additional benefits per floor and common areas
Ground floor: Apartments on the ground floor have their own garden of approximately 20 m².
Floor: The apartments on the first floor share a spacious roof terrace with a total area of 107 m² (each apartment has 53.5 m²).
Common areas: All tenants have access to a common storage area of 6.7 m².
Parking: The facility has 6 parking spaces (each apartment has 1 marked space, while 2 additional spaces are available).
Construction quality and equipment
The building is built according to high standards of contemporary architecture. Top quality construction works, built-in anthracite carpentry and modern glass railings on the balconies. Each residential unit is equipped with 3 air conditioners (in the living room and bedrooms). Bathrooms are delivered fully equipped and functional. The apartments are sold unfurnished and are ready to move in with the buyer’s own furniture.
Additional possibility
According to the agreement, the investor offers the option of complete interior decoration according to the wishes of the customer or according to the existing 3D proposals.
Infrastructure and connections
At the moment, the building does not have a direct connection to the public water supply and sewerage network, but it is expected to be connected in 2027. During construction, the complete preparation of installations for quick and easy connection to the public infrastructure is carried out as soon as it becomes available at the location.
Documentation The seller has proper and complete documentation that is available for inspection at the agency.
Building permit (use permit upon completion of the facility), Main and implementation projects Moodboard (book of standards) with a proposal for interior design, Professional 3D visualizations of exteriors and interiors.
Purchase models
It is possible to buy individual apartments or the building as a whole.
The brokerage fee is calculated in accordance with the General Terms and Conditions.