$3,556,627

Attractive Townhouse In Establiments, With Construction Scheduled For Completion By The End Of 2025.

  • 3 Beds
  • 4 Baths
  • 3,660 Sqft
  • 5,779 Sqft lot
  • Updated: August 13
  • 3
    Views for last 30 days
  • 1

About the Property

The property is located on a 536.80 m² plot and is a two-storey house with a total floor area of 340 m² and 280 m² of usable space.
Ground floor with entrance hall, interior patio, living/dining room with fireplace and fully equipped and furnished open-plan kitchen, laundry room, 1 toilet and 1 bedroom with 1 en-suite bathroom with dressing room. Garage for 2 cars.
This floor has access to
The property is located on a 536.80 m² plot and is a two-storey house with a total floor area of 340 m² and 280 m² of usable space.
Ground floor with entrance hall, interior patio, living/dining room with fireplace and fully equipped and furnished open-plan kitchen, laundry room, 1 toilet and 1 bedroom with 1 en-suite bathroom with dressing room. Garage for 2 cars.
This floor has access to the garden with pergola and saltwater swimming pool.
First floor with 2 bedrooms and 2 bathrooms and large terrace of 102m2.
Underfloor heating in natural stone and oak, air conditioning, satellite TV, video intercom, drip irrigation and barbecue, oak carpentry and alarm.
Establiments is a highly sought-after and quiet area, with all kinds of services and just a few minutes from the centre of Palma and 20 minutes from the airport.
  • Property type

    Townhouse

  • Price/sqft

    $971

Features

  • Garden
  • Pool
  • Terrace
  • Garage
  • Open Kitchen
  • Walk In Closet
  • Fireplace
  • Pergola
  • New Builds
Features

Lot

  • New Builds

Indoor

  • Office
  • Fireplace
  • Air Conditioning
  • Laundry Room
  • Open Kitchen
  • Stone Countertops
  • Walk In Closet

Outdoor

  • Terrace
  • Pool
  • Garage
  • Outdoor Living Space
  • Pergola
  • Garden

Explore the Area

Establiments, 07141, Spain View on Google Maps
Price per sqft
Low
High
Located in Establiments, a peaceful suburb of Palma de Mallorca, this property offers convenient access to Palma city center and the Mediterranean coast within a 15-minute drive. Nearby amenities include upscale dining, golf clubs, and natural parks. Palma Airport is reachable in 20 minutes, providing easy international connectivity. The area balances residential tranquility with proximity to cultural venues, shopping, and quality international schools.
Get nearby
Attractions
Schools
Palma de Mallorca Airport
Airport
20 min
Palma Intermodal Station
Train Station
15 min
Port of Palma
Port / Marina
15 min
Golf Son Vida
Golf & Country Clubs
10 min
Es Baluard Museum of Modern and Contemporary Art
Culture & Heritage
15 min
Purobeach Palma
Luxury Wellness & Spas
20 min
Paseo del Borne Shopping District
Shopping & Lifestyle
15 min
Parc Natural de s'Albufera de Mallorca
Outdoor & Nature
25 min
American School of Mallorca
International School
15 min
Colegio Baleares
International School
10 min
Colegio San Cayetano
Private School
15 min

View 3,391 more listings in Palma

Living By Carlos Finest Real Estate

Joined 3 months ago
Your message
You have inquired about this property

The agent will contact you soon by

Listed by

Living By Carlos Finest Real Estate
Spain
View agency profile
56
Listings
2026
Joined

Book home tour with the agent

Choose a date and whether you'd like a virtual or in-person tour with the agent.

In-person tour
Preferred date
Tour type
Living By Carlos Finest Real Estate
Portals Nous, Spain
View agency profile
Last updated
August 13
First listed
May 13
Listing reference
2645
Call

Start phone call with:

Hello, I’m calling for the property with the reference 2645, which I discovered on JamesEdition.

After the call, we'll provide your contacts to the agent for easy communication.