Zimmermannplatz 6: Dachgeschoßwohnung mit 2 Kleinen Terrassen auf einer Ebene
2 Camere
1 Bagni
910 Sqft
Aggiornato: Novembre 18
Informazioni sulla proprietà
La descrizione è stata tradotta automaticamente.
La descrizione viene visualizzata nella lingua originale.
Perfectly renovated and newly built condominiums in a revitalized corner property near St. Anna Children’s Hospital
The revitalization of a beautiful Gründerzeit building at Zimmermannplatz is just beginning. Nine old building apartments of various sizes and orientations, along with two attic floors comprising a total of six additional apartments, await their new owners.
Perfectly renovated and newly built condominiums in a revitalized corner property near St. Anna Children’s Hospital
The revitalization of a beautiful Gründerzeit building at Zimmermannplatz is just beginning. Nine old building apartments of various sizes and orientations, along with two attic floors comprising a total of six additional apartments, await their new owners.
Everything is just right here: the central location, the optimal layouts, the sustainable renovation! Creating contemporary living space while preserving the historic heritage of the Gründerzeit building is perfectly balanced here.
The Project:
On a total usable area of 1,940 m², six new attic apartments will be created, each on a single level, along with nine old building apartments and a commercial space.
The Entrance and Facade:
The main entrance and lift access will be barrier-free, the facade will be revitalized, and the windows will be fitted with multi-layer insulation. The roof will be completely renewed and will blend beautifully into the ensemble. A step-free accessible bicycle room makes life easier for cyclists.
The Old Building Apartments:
Due to the corner location, the old building apartments face two to three different directions and offer unobstructed views. On the street side, the apartments have a wide view towards Zimmermannplatz, and on the garden side, they overlook the green garden into another large inner courtyard.
The location is highly sought after: situated in the heart of a very popular, established residential area of Vienna’s 9th district, away from tourist crowds and very well connected to public transport. The AKH-Michelbeuern subway station is only 300 meters or a 3-minute walk away. Local shopping options are also excellent.
The Attic Apartments:
Four apartments will be built on the first attic floor, and two apartments on the second attic floor. The great advantage is that all six apartments are designed on a single level and are therefore barrier-free inside.
The Technology:
Sustainability is truly a priority in this building: the house, including the basement areas, is being economically upgraded. Central heating and cooling are provided by an air heat pump, which will be discreetly installed on the roof.
A new elevator will be installed, allowing step-free access to the apartments.
Construction Activity and Completion:
Project financing is secured, and construction work has already begun. The old building apartments will be completed by the second quarter of 2027, at which time the major construction work in the attic will also be finalized. Completion work in the attic is planned for the first quarter of 2028.
The project owner is the United Group of Companies, a family-run corporate group based in Malta, with a history dating back to 1926.
Attic Expansion Top 21 - New Apartment with 2 Small Outdoor Areas
On the first of two attic floors, a well-designed apartment with 88.42 m² of living space and small outdoor areas on a single level is being created. Both the entrance to the building and the apartment are barrier-free.
The apartment faces east-west and has a small outdoor area on both sides.
The current layout includes:
Spacious entrance hall or corridor (15.07 m²)
Courtyard-facing terrace (1.83 m²)
WC with hand basin (1.99 m²)
Bathroom with bathtub and shower (4.53 m²)
Living kitchen (27.60 m²) with adjoining loggia (3.37 m²)
Bedroom (21.58 m²) with large window facing the courtyard
Bedroom (13.73 m²) with window facing Meynertgasse
Cellar compartment in renovated basement (4.18 m²)
Features:
First occupancy after completion in a fully renovated building
High ceiling height of 2.52 m
Heating and cooling via air heat pump
Underfloor heating
Real parquet flooring
Bathroom with bathtub and shower
Separate guest WC
Barrier-free access to the building and apartment
Barrier-free accessible bicycle room
We look forward to your interest in this property and are happy to arrange a viewing,
Your team at Elisabeth Rohr Real Estate
Note according to the Energy Performance Certificate Presentation Act: An energy certificate has not yet been presented by the owner or seller, despite our clarification about the general obligation to present one and the request for its preparation. Therefore, at least an overall energy efficiency corresponding to the age and type of the building is assumed. We assume no liability or warranty for the actual energy efficiency of the offered property.
Zimmermannplatz, AKH Vienna, St. Anna Children’s Hospital, Meynertgasse, U6, Alserstraße, Lazarettgasse, Hebragasse, Inner District