$654,472

Casa Bifamiliare Con 3 Camere Da Letto Con Piscina E Seminterrato | La Costruzione Dovrebbe Iniziare Nel 2

  • 3 Camere
  • 4 Bagni
  • 1,378 Sqft
  • 1,712 Sqft lot
  • Aggiornato: Luglio 25

Informazioni sulla proprietà

La descrizione è stata tradotta automaticamente.
La descrizione viene visualizzata nella lingua originale.
Discover this modern 3-bedroom semi-detached house, a contemporary architectural project that combines comfort, functionality and high-quality construction. With building works scheduled to begin in early 2027, this represents an excellent opportunity to acquire a brand-new home, with the possibility of following the progress of the construction and, depending on the stage of the works, personalis
Discover this modern 3-bedroom semi-detached house, a contemporary architectural project that combines comfort, functionality and high-quality construction. With building works scheduled to begin in early 2027, this represents an excellent opportunity to acquire a brand-new home, with the possibility of following the progress of the construction and, depending on the stage of the works, personalising certain finishes.

Set on a 159.22 m² plot, the property is distributed over a basement, ground floor and first floor. It also benefits from a separate 27.30 m² garage and a private swimming pool, ideal for enjoying summer days with complete comfort and privacy.

With a total gross construction area of 127.96 m² and a footprint of 63.87 m², the house has been designed to maximise natural light and ensure a practical and functional layout.

The ground floor is entirely dedicated to the social area of the home, where a spacious living and dining room connects harmoniously with the open-plan kitchen, providing a total area of 52.75 m². This space has been designed to offer a welcoming and practical environment, perfect for everyday family life and entertaining guests. This floor also includes a guest bathroom measuring 2.40 m².

The first floor comprises the private area of the house, consisting of three bedrooms. Two of the bedrooms, measuring 11.10 m² and 11.70 m², are supported by a full bathroom of 3.65 m². The master suite, with an area of 14.00 m², offers a private and comfortable space, complemented by an en-suite bathroom measuring 4.70 m².

The basement, with an area of 41.80 m², provides an additional versatile space that can be adapted to suit different needs, such as an additional garage area, home cinema, gym, office, games room or storage space. It also includes a supporting bathroom measuring 2.70 m².

Outside, in addition to the separate 27.30 m² garage, the private swimming pool stands out as a valuable feature, enhancing the property and creating the perfect setting for leisure moments with family and friends.

This property stands out for its modern architecture, excellent space organisation and the perfect balance between design, comfort and functionality, making it an ideal choice for those looking for a contemporary home at an early stage of construction.

Do not miss this opportunity to invest in a new-build property designed to meet the demands of modern living and provide an exceptional quality of life. Contact us for further information, floor plans, the specifications and finishes brochure, and all purchasing details.
…
  • Tipo di proprietà

    Villa

  • Anno di costruzione

    2027

  • Prezzo/piede²

    $475

Caratteristiche

  • Giardino
  • Piscina
  • Garage
  • Centro Fitness / Palestra
  • Cinema
  • Moderno
  • Nuove costruzioni
  • Planimetria 2D
  • Seminterrato
Caratteristiche

Lot

  • Privacy
  • Nuove costruzioni
  • Moderno

Interni

  • Ufficio
  • Aria condizionata
  • Cinema
  • Seminterrato
  • Centro Fitness / Palestra

Outdoor

  • Balcone
  • Piscina
  • Garage
  • Giardino

Esplora la zona

Rua Antero de Figueiredo, Fernão Ferro, Portugal, Setúbal Municipality, Portogallo Visualizza su Google Maps
Prezzo per sqft
Basso
Alto

Vedi altri 347 annunci a Fernão Ferro

CENTURY 21 Rio

Iscritto da 5 anni
Il tuo messaggio
Hai chiesto informazioni su questa proprietà

L'agente La contatterà al più presto

Pubblicato da

CENTURY 21 Rio
Portugal
Visualizza profilo agenzia
38
Annunci
2022
Iscritto

Prenota una visita con the agent

Scegli una data e indica se preferisci un tour virtuale o di persona con l’agente.

In-person tour
Data preferita
Tipo di tour
CENTURY 21 Rio
Almada, Portugal
Visualizza profilo agenzia
Ultimo aggiornamento
Luglio 25
Prima pubblicazione
Luglio 25
Riferimento annuncio
C0442-00731
Chiamata

Avvia chiamata telefonica con:

Salve, chiamo per la proprietà con riferimento C0442-00731, che ho trovato su JamesEdition.

Dopo la chiamata, forniremo i tuoi contatti all'agente per una comunicazione facile.