Edificio DI Lusso A 30 Metri Dal Mare DI Fronte All'oceano Sulla Spiaggia DI Cachoeira Do Bom Jesus Florianópolis Ap 2 Demisuites
2 Camere
2 Bagni
689 Sqft
Aggiornato: Maggio 23
2
Visualizzazioni degli ultimi 30 giorni
Informazioni sulla proprietà
La descrizione è stata tradotta automaticamente.
La descrizione viene visualizzata nella lingua originale.
Luxury building facing the sea and 30 meters from Cachoeira do Bom Jesus beach - Florianópolis - Apartment with 2 demi-suites.
Building under construction with expected delivery in January 2028, with a terrace lounge area, infinity pool with ocean views, gym, private grill, kids’ area, swimming pool, children’s pool, 2 party rooms, game room, accessibility for the disabled, elevator, alar
Luxury building facing the sea and 30 meters from Cachoeira do Bom Jesus beach - Florianópolis - Apartment with 2 demi-suites.
Building under construction with expected delivery in January 2028, with a terrace lounge area, infinity pool with ocean views, gym, private grill, kids’ area, swimming pool, children’s pool, 2 party rooms, game room, accessibility for the disabled, elevator, alarm, paved areas, central heating, bicycle storage, CCTV, office, cinema room, changing rooms and restrooms in the terrace entertainment area, oceanfront, shared internet, shared satellite TV, electronic gate, on the 30 meters from the sea, fire system, kitchen, public elevator, service elevator, service entrance, laundry room, doorman, service area, on the ground floor there is a boulevard with 8 commercial spaces. It has apartment units Units 216 and 316, each with 3 suites and a private area of 153,31 m². Unit 102 a duplex garden loft with a mezzanine, has a private area of 126,33 m², a 48,22 m² loft, a 22,06 m² mezzanine, an 8,67 m² veranda, and a 25,50 m² garden.
Apartment with 2 semi-suites, a private area of 64 m², and a total area of 76 m², includes a covered garage for 1 car, a living room, an open-plan kitchen/dining area, a balcony with a barbecue, a service area, and 2 bathrooms. Price: R$ [hidden information] Reals, can buy with a down payment and monthly installments until the building’s completion in January 2028.