$653,864

Maison Mitoyenne De 3 Chambres Avec Piscine Et Sous Sol | La Construction Devrait Commencer En 2

  • 3 Chambres
  • 4 SdB
  • 1,378 Sqft
  • 1,712 Sqft lot
  • Mis à jour: Juillet 25

À propos de la propriété

La description a été traduite automatiquement.
La description est affichée dans la langue d'origine.
Discover this modern 3-bedroom semi-detached house, a contemporary architectural project that combines comfort, functionality and high-quality construction. With building works scheduled to begin in early 2027, this represents an excellent opportunity to acquire a brand-new home, with the possibility of following the progress of the construction and, depending on the stage of the works, personalis
Discover this modern 3-bedroom semi-detached house, a contemporary architectural project that combines comfort, functionality and high-quality construction. With building works scheduled to begin in early 2027, this represents an excellent opportunity to acquire a brand-new home, with the possibility of following the progress of the construction and, depending on the stage of the works, personalising certain finishes.

Set on a 159.22 m² plot, the property is distributed over a basement, ground floor and first floor. It also benefits from a separate 27.30 m² garage and a private swimming pool, ideal for enjoying summer days with complete comfort and privacy.

With a total gross construction area of 127.96 m² and a footprint of 63.87 m², the house has been designed to maximise natural light and ensure a practical and functional layout.

The ground floor is entirely dedicated to the social area of the home, where a spacious living and dining room connects harmoniously with the open-plan kitchen, providing a total area of 52.75 m². This space has been designed to offer a welcoming and practical environment, perfect for everyday family life and entertaining guests. This floor also includes a guest bathroom measuring 2.40 m².

The first floor comprises the private area of the house, consisting of three bedrooms. Two of the bedrooms, measuring 11.10 m² and 11.70 m², are supported by a full bathroom of 3.65 m². The master suite, with an area of 14.00 m², offers a private and comfortable space, complemented by an en-suite bathroom measuring 4.70 m².

The basement, with an area of 41.80 m², provides an additional versatile space that can be adapted to suit different needs, such as an additional garage area, home cinema, gym, office, games room or storage space. It also includes a supporting bathroom measuring 2.70 m².

Outside, in addition to the separate 27.30 m² garage, the private swimming pool stands out as a valuable feature, enhancing the property and creating the perfect setting for leisure moments with family and friends.

This property stands out for its modern architecture, excellent space organisation and the perfect balance between design, comfort and functionality, making it an ideal choice for those looking for a contemporary home at an early stage of construction.

Do not miss this opportunity to invest in a new-build property designed to meet the demands of modern living and provide an exceptional quality of life. Contact us for further information, floor plans, the specifications and finishes brochure, and all purchasing details.
…
  • Type de propriété

    Villa

  • Année de construction

    2027

  • Prix/pied²

    $474

Caractéristiques

  • Jardin
  • Piscine
  • Garage
  • Centre de remise en forme / Fitness
  • Cinéma
  • Moderne
  • Constructions neuves
  • Plan d’étage 2D
  • Sous-sol
Caractéristiques

Lot

  • Vie privée
  • Constructions neuves
  • Moderne

Intérieur

  • Bureau
  • Climatisation
  • Cinéma
  • Sous-sol
  • Centre de remise en forme / Fitness

Outdoor

  • Balcon
  • Piscine
  • Garage
  • Jardin

Explorez le secteur

Rua Antero de Figueiredo, Fernão Ferro, Setúbal Municipality, Portugal Voir sur Google Maps
Prix par sqft
Faible
Élevé

Voir 347 autres annonces à Fernão Ferro

CENTURY 21 Rio

Inscrit il y a 5 ans
Votre message
Vous vous êtes renseigné sur ce bien

L'agent vous contactera bientôt par

Publié par

CENTURY 21 Rio
Portugal
Voir le profil de l’agence
38
Annonces
2022
Inscrit

Réserver une visite avec the agent

Choisissez une date et si vous souhaitez une visite virtuelle ou en personne avec l’agent.

In-person tour
Date préférée
Type de visite
CENTURY 21 Rio
Almada, Portugal
Voir le profil de l’agence
Dernière mise à jour
Juillet 25
Première mise en ligne
Juillet 25
Référence de l’annonce
C0442-00731
Appel

Démarrer un appel téléphonique avec :

Bonjour, j'appelle au sujet du bien avec la référence C0442-00731, que j'ai vu sur JamesEdition.

Après l'appel, nous transmettrons vos coordonnées à l'agent pour faciliter la communication.