$3,561,187

Maison De Ville Attrayante à Establiments, Dont La Construction Devrait être Achevée D'ici La Fin De 2025.

  • 3 Chambres
  • 4 SdB
  • 3,660 Sqft
  • 5,779 Sqft lot
  • Mis à jour: Août 13
  • 3
    Vues des 30 derniers jours
  • 1

À propos de la propriété

La description a été traduite automatiquement.
La description est affichée dans la langue d'origine.
The property is located on a 536.80 m² plot and is a two-storey house with a total floor area of 340 m² and 280 m² of usable space.
Ground floor with entrance hall, interior patio, living/dining room with fireplace and fully equipped and furnished open-plan kitchen, laundry room, 1 toilet and 1 bedroom with 1 en-suite bathroom with dressing room. Garage for 2 cars.
This floor has access to
The property is located on a 536.80 m² plot and is a two-storey house with a total floor area of 340 m² and 280 m² of usable space.
Ground floor with entrance hall, interior patio, living/dining room with fireplace and fully equipped and furnished open-plan kitchen, laundry room, 1 toilet and 1 bedroom with 1 en-suite bathroom with dressing room. Garage for 2 cars.
This floor has access to the garden with pergola and saltwater swimming pool.
First floor with 2 bedrooms and 2 bathrooms and large terrace of 102m2.
Underfloor heating in natural stone and oak, air conditioning, satellite TV, video intercom, drip irrigation and barbecue, oak carpentry and alarm.
Establiments is a highly sought-after and quiet area, with all kinds of services and just a few minutes from the centre of Palma and 20 minutes from the airport.
  • Type de propriété

    Maison de ville

  • Prix/pied²

    $973

Caractéristiques

  • Jardin
  • Piscine
  • Terrasse
  • Garage
  • Cuisine ouverte
  • Dressing
  • Cheminée
  • Pergola
  • Constructions neuves
Caractéristiques

Lot

  • Constructions neuves

Intérieur

  • Bureau
  • Cheminée
  • Climatisation
  • Buanderie
  • Cuisine ouverte
  • Comptoirs en pierre
  • Dressing

Outdoor

  • Terrasse
  • Piscine
  • Garage
  • Espace de vie extérieur
  • Pergola
  • Jardin

Explorez le secteur

Establiments, 07141, Spain Voir sur Google Maps
Prix par sqft
Faible
Élevé
Located in Establiments, a peaceful suburb of Palma de Mallorca, this property offers convenient access to Palma city center and the Mediterranean coast within a 15-minute drive. Nearby amenities include upscale dining, golf clubs, and natural parks. Palma Airport is reachable in 20 minutes, providing easy international connectivity. The area balances residential tranquility with proximity to cultural venues, shopping, and quality international schools.
Voir à proximité
Attractions
Écoles
Palma de Mallorca Airport
Airport
20 min
Palma Intermodal Station
Train Station
15 min
Port of Palma
Port / Marina
15 min
Golf Son Vida
Golf & Country Clubs
10 min
Es Baluard Museum of Modern and Contemporary Art
Culture & Heritage
15 min
Purobeach Palma
Luxury Wellness & Spas
20 min
Paseo del Borne Shopping District
Shopping & Lifestyle
15 min
Parc Natural de s'Albufera de Mallorca
Outdoor & Nature
25 min
American School of Mallorca
International School
15 min
Colegio Baleares
International School
10 min
Colegio San Cayetano
Private School
15 min

Voir 3,392 autres annonces à Palma

Living By Carlos Finest Real Estate

Inscrit il y a 3 mois
Votre message
Vous vous êtes renseigné sur ce bien

L'agent vous contactera bientôt par

Publié par

Living By Carlos Finest Real Estate
Spain
Voir le profil de l’agence
56
Annonces
2026
Inscrit

Réserver une visite avec the agent

Choisissez une date et si vous souhaitez une visite virtuelle ou en personne avec l’agent.

In-person tour
Date préférée
Type de visite
Living By Carlos Finest Real Estate
Portals Nous, Spain
Voir le profil de l’agence
Dernière mise à jour
Août 13
Première mise en ligne
May 13
Référence de l’annonce
2645
Appel

Démarrer un appel téléphonique avec :

Bonjour, j'appelle au sujet du bien avec la référence 2645, que j'ai vu sur JamesEdition.

Après l'appel, nous transmettrons vos coordonnées à l'agent pour faciliter la communication.