Fraction B M2. A1 B T3 Lot 2 Bloc A Étage 1 (Rc) T3. Eq Orientação W/N Area 127,3 Extérieur 182,7
3 Chambres
3 SdB
Mis à jour: Juin 18
À propos de la propriété
La description a été traduite automatiquement.
La description est affichée dans la langue d'origine.
FRACTION B M2. A1B_T3 LOT 2 BLOCK A FLOOR 1 (RC) T3. Equivalent fraction ORIENTATION - W/N AREA 127.3 EXTERIOR 182.7 TOTAL 310.0
PARKING: - 2 SPACES P. 76_P. 77 - AREA 25.8 - FLOOR -2
STORAGE: - A. 55 - AREA 3.4 - FLOOR -2
PAYMENT CONDITIONS: The deadline for M1, M2, M3, and M4 is 33 months for construction. Conditions: - 2
FRACTION B M2. A1B_T3 LOT 2 BLOCK A FLOOR 1 (RC) T3. Equivalent fraction ORIENTATION - W/N AREA 127.3 EXTERIOR 182.7 TOTAL 310.0
PARKING: - 2 SPACES P. 76_P. 77 - AREA 25.8 - FLOOR -2
STORAGE: - A. 55 - AREA 3.4 - FLOOR -2
PAYMENT CONDITIONS: The deadline for M1, M2, M3, and M4 is 33 months for construction. Conditions: - 20% on signing; - 10% on signing with completion of the reinforced concrete structure; - 10% on signing with framing; - Remaining balance on the deed. (ref OP-013007100)