La description est affichée dans la langue d'origine.
Penthouse in New Development – Project in Preparation | Bibinje, Second Row from the Sea Estimated completion: December 2026
In a peaceful part of Bibinje, just 50 meters from the sea, Penthouse S5 is part of a modern new development that stands out with its contemporary architecture, functional layout, and high standard of construction. Only a one-minute walk to a well-maintained bea
Penthouse in New Development – Project in Preparation | Bibinje, Second Row from the Sea Estimated completion: December 2026
In a peaceful part of Bibinje, just 50 meters from the sea, Penthouse S5 is part of a modern new development that stands out with its contemporary architecture, functional layout, and high standard of construction. Only a one-minute walk to a well-maintained beach.
The penthouse is located on the second floor of a residential building with an elevator. The building consists of a ground floor and two upper floors. Each unit is carefully designed for comfort, functionality, and privacy – ideal for everyday living, vacation, or tourist rental.
Penthouse S5 consists of:
three bedrooms (8 m², 10 m², and 12 m²)
kitchen, dining, and living area with a total size of 28.5 m²
two bathrooms (4.4 m² and 3.4 m²)
laundry room (2.2 m²)
storage room (3.67 m²)
loggia (10 m²)
uncovered rooftop terrace (77.8 m²) with private pool (15 m²)
outdoor uncovered parking space (12.5 m²)
Area: Net usable area: 130 m² Gross construction area: 215.08 m²
The apartment will be built according to modern construction standards, using high-quality materials and equipment. Features include underfloor heating, air conditioning, remote-controlled electric shutters, large-format Italian ceramics, low-noise installations, and excellent thermal and sound insulation. Elevator access is provided.
Location: The apartment is in a quiet street with direct access to the sea. Nearby amenities include restaurants, shops, a marina, walking paths, and everything needed for a comfortable stay year-round.
Note: The project is in the preparation phase. Construction completion and move-in are planned for December 2026. The buyer does not pay an agency commission.
For more information, floor plans, technical specifications or reservations, feel free to contact us: [hidden information] [hidden information]