T4 Penthouse With Swimming Pool In A Private Condominium In Nevogilde Under Construction, Scheduled

$2,884,014
  • 4 Beds
  • 5 Baths
  • 2,918 sqft
  • 5,386 sqft lot
  • $988/sqft
T4 Penthouse with pool and garage in a private condominium in Nevogilde Foz Porto

Under construction, scheduled for delivery at the end of 2024, Casal de Passos – Condomínio Foz do Douro is l
T4 Penthouse with pool and garage in a private condominium in Nevogilde Foz Porto

Under construction, scheduled for delivery at the end of 2024, Casal de Passos – Condomínio Foz do Douro is located in Travessa dos Passos in a privileged location in the city of Porto. This area mainly features single-family homes. Nevogilde is quiet, safe and attractive.

The perfect balance between nature, architecture and innovation, allowing residents a better quality of life.

The penthouse, the only one in the development, is surrounded by balconies and is distributed over a large living room, guest bathroom, kitchen, laundry room and 4 suites. It has a direct and exclusive connection, by elevator, to the garage box, which is also exclusive. Separately, there is another parking space.

Highlights
- Old farmhouse converted to design by architect José Carlos Cruz
- Very private gated community with very few units
- Only penthouse in the condominium
- The penthouse can be completely redesigned internally by the architect. In fact, it´s the right time, you can still choose finishes for the pool and some surroundings for the terrace.
- 360 degree view of the sea and city park, as the terrace surrounds the entire penthouse
- 3 parking spaces (2 car spaces in a closed garage box Box J + 1 extra space M)
- Elevator with direct access to the penthouse from the garage
- Heat pump for water
- Air conditioning
- Underfloor heating in bathrooms
- Home automation to control blinds, air conditioning, lighting and video intercom so you can always be in touch
  • Last updated: Yesterday
  • Views 1
  • Saves 2

In Detail

Features

  • Terrace
  • Garage
  • Elevator
  • Pool
  • Gated Community
  • Panoramic / Scenic View
  • Outdoor Living Space
  • Laundry Room
  • 2D Floor Plan
Features

Lot

  • Gated Community
  • Panoramic / Scenic View

Indoor

  • Elevator
  • Air Conditioning
  • Laundry Room

Outdoor

  • Terrace
  • Garage
  • Outdoor Living Space
  • Parking
  • Balcony
  • Pool

Ask a Question

Residents Real Estate

3 years with JamesEdition

Contact Agent

Tour type

Explore the Area

Aldoar, Foz do Douro e Nevogilde, Porto, Porto, Porto District, Portugal. See on Google Maps
Price per sqft
Low
High

View 3,684 more listings in Porto

About the Building

  • Property type

    Apartment

Residents Real Estate

3 years with JamesEdition
You have inquired about this property

The agent will contact you soon by

Listed by

About

RESIDENTS – Real Estate is a real estate agency specialized in Porto´s prime zones and particularly dedicated to wo
RESIDENTS – Real Estate is a real estate agency specialized in Porto´s prime zones and particularly dedicated to work with foreign investors and buyers.

Who we are

RESIDENTS – Real Estate is a real estate agency specialized in Porto´s prime zones and particularly dedicated to work with foreign investors and buyers.

Its founders have over 10 years of experience in the real estate market and were at the genesis of another project in the city of Porto, which they abandoned to create and develop RESINDENTS.

RESIDENTS was created in 2021 to fill a gap that its founders believe exists in the real estate market in the city of Porto.

In this sense, RESIDENTS intends to simultaneously fulfill the following requirements:
• Detailed knowledge of the commercialized areas;
• Vocation and preparation to work with foreign investors and buyers;
• Technical capacity to monitor and advise foreign entities and persons regarding their investments in Portugal;
• Technical capacity and competence assured by many years of experience in the economic and financial evaluation of real estate investments;
• Legal partnerships to accompany and advise Portuguese and foreigners on related matters such as:
o Real estate law;
o Taxation;
o Non-Habitual Residents Regime;
o Residence Visas and
o Gold Visas.

All RESIDENTS´ staff has in-depth knowledge of the commercialized areas. For this reason, RESIDENTS has its areas of action restricted to prime areas of the city of Porto, with only a few exceptions being made in very particular cases.

In order to fulfill its transnational vocation, RESIDENTS has protocols and partnerships with a number of entities in order to attract clients outside Portugal interested in investing or seeking residence in this country.

RESIDENTS´ partners have academic training and specializations in the legal, economic and marketing areas in Portugal and abroad. This factor guarantees the technical capacity needed for an excellent follow-up, both in a simple purchase and sale, as well as in more complex deals and transactions.

Finally and most importantly, what we intend to be our greatest asset: TRUST.
We are guided by high standards of transparency, ethics and competence. The reputation of Residents partners is our company´s most important asset. We want RESIDENTS to be synonymous with TRUST and that is what we are committed to in our entire activity.

Partners

Ana Aroso has a degree in Law from Universidade Católica Portuguesa. She is specialized in Real Estate Law at Universidade Católica Portuguesa and has more than 6 years of experience in real estate mediation.

Isabel Pinto Leite has a degree in Sound and Image from Universidade Católica Portuguesa. He has been working for about 4 years in the real estate business.

João Pinto Leite has a degree in Management from Universidade Católica Portuguesa. He is Chartered Accountant, Post Graduated in Taxation and specialized in International Taxation by the International Tax Center of the University of Leiden (Netherlands).

André Machado Vaz has a degree in Economics from the Faculty of Economics of the University of Porto. He is Chartered Accountant, Post Graduated in Taxation and specialized in International Taxation by the Chartered Institute of Taxation (London).

Registered on JamesEdition

2022

Address

Rua de Diu, 444, 4150-273, Porto, Portugal

Phone number

Show phone number

Listing Reference

R21365

Last updated

Yesterday

Listed

September 23, 2023
Call